HomeTagsElectricity demand

electricity demand - Page 16

Stories from electricity demand come first, newest first, then stories from connected topics (Department of Energy, power grid, power for AI, Data Centres & Energy, data centres, AI infrastructure), each labelled with where it comes from. This view is not indexed by search engines.

Latest

Fermi America Gets Draft NRC Review as Batteries Undercut Gas Peakers

The NRC has published a draft environmental impact statement for Fermi America's four proposed AP1000 reactors in Carson County, Texas, with comments due 23 November 2026. It is a draft, not a licence. Separately, Wood Mackenzie estimates four-hour battery storage is "65% to 75% cheaper" than new gas peakers in the US.

Space Roundup: SpaceX Agrees to Buy Mobile Spectrum, NASA Goes Nuclear and Amazon Leo Nears Launch

SpaceX agrees to buy up to 14 MHz of 800 MHz spectrum from Grain Management, pending FCC approval; no price was disclosed. NASA and the Department of Energy sign a space nuclear power pact, with a reactor spacecraft planned for 2028 and a lunar reactor a 2030 goal. Amazon Leo passes 1,000 satellites built, Blue Origin plans a $554.78 million factory in Texas, and Crew-12 is home.

Quantum Plans and Post-Quantum Keys: DOE’s Eight Problems, Fujitsu in New Mexico and Cosmos’s New Signatures

Three quantum items from 8 October 2026: the US Department of Energy names eight science problems that a useful quantum computer should tackle, Fujitsu signs a nonbinding MOU to set up a quantum research centre in New Mexico, and Cosmos ships optional post-quantum ML-DSA keys for blockchains built on its software. What each is, and what it is not.

Duke and Indiana Deals Put More AI Power Costs on Data Centres

Duke Energy, Amazon, Google and Microsoft have filed a North Carolina settlement that makes big data centres pay upfront, sign 10–15 year contracts and accept some power cuts. Indiana approved Google paying the full cost of serving a 390 MW site, and a bipartisan Senate bill would make data centres pay for the grid upgrades they trigger. And gas equipment is being shipped straight to AI projects: a 380 MW Doosan turbine for SpaceXAI and 282 MW of Wärtsilä engines. What is agreed and what still needs approval.

Biohub, DOE and NIH Lead $1.8bn Push for AI-Ready Biology Data

Biohub, the US DOE and NIH, with $300m from Google DeepMind, Isomorphic Labs and Meta, are pooling $1.8bn to generate open data for AI cell models.

Energy as Infrastructure Control: The New Geopolitical Leverage

Energy infrastructure is the new bottleneck constraining AI scaling. Hyperscalers building dedicated power plants. China dominance. Geopolitical leverage shifting upstream.

Latest on TSN

Explore the TSN Atlas: Every topic we cover, mapped. Click a bubble to dive in.