grid connection queue - Page 24
Stories from grid connection queue come first, newest first, then stories from connected topics (power grid, UK, AI infrastructure, data centres, Data Centres & Energy, Tech News), each labelled with where it comes from. This view is not indexed by search engines.
Explore related topics in the Atlas →
Latest
Sunrun and Tesla Home Batteries Deliver a Record 745MW to California’s Grid
Sunrun says home batteries run by it and Tesla delivered a record 745MW to California's grid on 6 October during a heat wave. No split or MWh figure given.
Tata Power Says It Has a 2.8 GW+ Data-Centre Opportunity Pipeline Across 18 Operators, and Is Upgrading Mumbai’s Grid
Tata Power says it has a data-centre opportunity pipeline of over 2.8 GW across 18 operators and is upgrading Mumbai's grid under a Rs 15,000 crore plan.
US Energy Department Plans $250 Million for 84 TVA Grid Projects Across Eight States
DOE plans $250m in federal funding for 84 TVA grid projects in eight states, adding about 2.5 GW. Awards aren't final until DOE agreements are signed.
Mainspring Energy Signs AEP Deal for Up to 1.6 GW of Linear Generators Through 2034, Starting With 190 MW From 2027
AEP will buy up to 1.6 GW of Mainspring linear generators through 2034. Only the first 190 MW, due from 2027, is a firm order. No price was disclosed.
US Energy Department Orders Emergency Measures for the Mid-Atlantic Grid, Letting PJM Call on Data-Centre Backup Generators
DOE's emergency order, in force 13-16 Oct 2026, lets PJM run listed power plants and call on backup generators to help avoid blackouts in the mid-Atlantic.
SWI Group Raises €800M at a €6.1bn Valuation for AI Infrastructure, and Plans to Turn an Ex-FTX-Backed Bitcoin Miner Into AI Data Centres
SWI Group raised €800M at a €6.1bn valuation for AI infrastructure. Its CEO reportedly plans to turn ex-FTX-backed miner Genesis Digital into AI sites.
Wärtsilä, Schneider Electric and Stanley Consultants Launch a “Generator-to-Chip” Approach for US Data-Centre Power; the Speed-Up Is Their Claim
Three firms launch a 'generator-to-chip' route to faster US data-centre power. Faster delivery is their claim; no MW, customer, cost or time saved given.
BUZZ HPC Says Oakville Taxpayers Won’t Pay Grid Costs for Its Proposed C$3.5bn, 320MW AI Campus
BUZZ HPC says it will privately fund the grid connection for its proposed C$3.5bn, 320MW Oakville AI campus. No application is filed, nothing is approved.
Energy as Infrastructure Control: The New Geopolitical Leverage
Energy infrastructure is the new bottleneck constraining AI scaling. Hyperscalers building dedicated power plants. China dominance. Geopolitical leverage shifting upstream.
Latest on TSN
Explore the TSN Atlas: Every topic we cover, mapped. Click a bubble to dive in.
