earnings - Page 21
Stories from earnings come first, newest first, then stories from connected topics (earnings guidance, Semiconductors, data centres, AI infrastructure, Finance, DRAM), each labelled with where it comes from. This view is not indexed by search engines.
Latest
Hitachi Energy Plans CAD 479m Transformer Insulation Plant in Ontario
Hitachi Energy will invest CAD 479m in a London, Ontario plant for transformer pressboard and laminates — insulation, not transformers. Due by 2028.
Infineon and Wolfspeed Extend SiC Wafer Supply Deal to 200 mm
Infineon and Wolfspeed moved their SiC wafer supply deal to 200 mm. No value or volumes disclosed; Yole market figure is via Wolfspeed.
Taiwan Plans a Texas Industrial Park for TSMC and Foxconn Suppliers
Taiwan plans a Texas park for TSMC and Foxconn suppliers, up to $4bn to start, Kung told Bloomberg. MOEA: firms fund it; land not confirmed.
SK hynix Shows CXL Pooled Memory and MARS Rack Demos at OCP 2026
At OCP Global Summit 2026, SK hynix showed second-gen CMM-DDR5, MARS rack demos and CMM-Ax. Bandwidth and efficiency gains are the company’s comparisons.
SemiAnalysis Says ASML Is Building a Hybrid Bonding Tool, Pointing to Patent Filings
SemiAnalysis says patents point to an ASML die-to-wafer hybrid bonder on a track. ASML has not announced one; the forecasts are SemiAnalysis's own.
VESSL AI Plans a Vera Rubin NVL72 Cluster in H1 2027 and 200,000 GPUs by 2030
Seoul Economic Daily and Edaily say VESSL AI plans a Vera Rubin NVL72 cluster in H1 2027 and 200,000 GPUs by 2030. Targets, not done deals.
Hillhouse’s TeraNova DC Plans $12-15bn, 2GW-Plus India Build by 2032
Hillhouse's new TeraNova DC platform plans $12-15bn and over 2GW of Indian data centres by 2032. How that compares with a market of about 2GW today.
Colt DCS and RMZ Begin Construction of Fully Pre-Let 64MW Mumbai 3
Colt DCS and RMZ began construction of Mumbai 3, a fully pre-let 64MW AI-ready data centre at their Navi Mumbai campus.
Elon Musk Says Micron Has Been ‘Reasonable’ on Memory Prices While ‘Others Have Been Extortionate’
Elon Musk praised Micron on X and said "others have been extortionate" on memory prices. He did not name any other company.
LG Electronics, GS E&C and GRC Sign MOU on AI Data-Centre Immersion Cooling
LG Electronics, GS E&C and GRC signed an MOU in Seoul to develop immersion cooling and standard designs for AI data centres.
Latest on TSN
Explore the TSN Atlas: Every topic we cover, mapped. Click a bubble to dive in.
