NVIDIA Vera Rubin - Page 4
Stories from NVIDIA Vera Rubin come first, newest first, then stories from connected topics (Nvidia, AI Chips & Compute, Data Centres & Energy, GPUs, cloud computing, AMD), each labelled with where it comes from. This view is not indexed by search engines.
Latest
China Sets 2030 Recycling Aims for Batteries, Solar and Wind
Nine Chinese departments issued opinions aiming, by 2030, to build a recycling system for household waste, EV batteries, solar panels and wind blades.
WinDC and Armada Sign LOI for Up to 3GW in Australia and NZ
WinDC and Armada have signed a letter of intent for planned modular AI data centres in Australia and New Zealand, targeting up to 3 GW by 2030.
Argentum AI and Kyndryl Sign $630 Million, 20-Year Boulder Deal
Argentum AI and Kyndryl have signed a 20-year, $630 million deal for an initial 10 MW of NVIDIA B300 inference capacity in Boulder. The tenant is unnamed.
Johns Hopkins Warns of US Transformer Shortages from 2027
A Johns Hopkins study projects US transformer and grid-equipment shortages from 2027, with data centres driving most of the modelled gap.
US Commerce and Justice Departments Detail the Megaspeed Probe
The US Commerce and Justice Departments have updated the public on their Megaspeed investigation, begun in 2024. No charges have been announced.
Blackstone’s BXDC to Buy About 75% of 13 AWS Data Centres
Blackstone’s BXDC has agreed to buy about 75% of 13 AWS data-centre shells in a roughly $5 billion sale-and-leaseback, expected to close in Q4 2026.
IBM and AMD Release Pelagos for Quantum Decoder Tests
IBM and AMD have released Pelagos, an open-source GPU tool for testing quantum error-correction decoders. It is a research tool, not a hardware milestone.
AMD Completes Its All-Stock Acquisition of World Labs
AMD has completed its acquisition of World Labs, with Fei-Fei Li joining as chief scientist. The all-stock deal was valued at about $8.2bn in September.
TensorWave and OpenAI Agree a 457MW AMD MI455X Deal
TensorWave has a six-year deal to give OpenAI 457MW of AMD MI455X capacity. No value was disclosed. First capacity is due in the first half of 2027.
Lambda Deploys NVIDIA Photonics CPO on a Large GPU Cluster
Lambda says it has deployed NVIDIA Photonics co-packaged optics switches to connect more than 10,000 GPUs at its Quebec campus.
Latest on TSN
Explore the TSN Atlas: Every topic we cover, mapped. Click a bubble to dive in.
