PJM - Page 2
Stories from PJM come first, newest first, then stories from connected topics (electricity, CapEx, power grid, Google, Data Centres & Energy, energy), each labelled with where it comes from. This view is not indexed by search engines.
Latest
EU Strikes Provisional Deal on Faster Grid Permitting
The EU has a provisional deal to speed permits for grids and clean energy. It is not law yet; formal adoption must come first, then 1.5 years to transpose.
China Sets 2030 Recycling Aims for Batteries, Solar and Wind
Nine Chinese departments issued opinions aiming, by 2030, to build a recycling system for household waste, EV batteries, solar panels and wind blades.
WinDC and Armada Sign LOI for Up to 3GW in Australia and NZ
WinDC and Armada have signed a letter of intent for planned modular AI data centres in Australia and New Zealand, targeting up to 3 GW by 2030.
Google Research Open-Sources StreetReaderAI for Blind Users
Google Research has open-sourced StreetReaderAI, a map app for non-visual street exploration, built with and for blind and low-vision users.
Argentum AI and Kyndryl Sign $630 Million, 20-Year Boulder Deal
Argentum AI and Kyndryl have signed a 20-year, $630 million deal for an initial 10 MW of NVIDIA B300 inference capacity in Boulder. The tenant is unnamed.
Johns Hopkins Warns of US Transformer Shortages from 2027
A Johns Hopkins study projects US transformer and grid-equipment shortages from 2027, with data centres driving most of the modelled gap.
Google Splits Gemini Chat History from AI Training
Google is splitting Gemini chat History from AI-training control, so users can keep history and turn training off. The change is rolling out globally.
Blackstone’s BXDC to Buy About 75% of 13 AWS Data Centres
Blackstone’s BXDC has agreed to buy about 75% of 13 AWS data-centre shells in a roughly $5 billion sale-and-leaseback, expected to close in Q4 2026.
MLPerf Training v6.1 Adds First Rubin GPUs and TPUv7
MLCommons has published MLPerf Training v6.1 results from 153 systems, including the first NVIDIA Rubin GPUs and Google TPUv7.
TensorWave and OpenAI Agree a 457MW AMD MI455X Deal
TensorWave has a six-year deal to give OpenAI 457MW of AMD MI455X capacity. No value was disclosed. First capacity is due in the first half of 2027.
Latest on TSN
Explore the TSN Atlas: Every topic we cover, mapped. Click a bubble to dive in.
