Texas - Page 6
Stories from Texas come first, newest first, then stories from connected topics (Data Centres & Energy, AI infrastructure, data centres, power for AI, energy, AI Chips & Compute), each labelled with where it comes from. This view is not indexed by search engines.
Latest
HUMAIN and Infra Sign Financing of Up to SAR 2.5bn
HUMAIN financing with Infra is up to SAR 2.5bn (about $667m) for AI compute and power. Figures are ceilings; pricing and tenor are undisclosed.
Google Adds TPU 8tx and TPU 8i Max to Eighth-Gen Line
Google added TPU 8tx for confidential inference and TPU 8i Max for dense context to its eighth-generation TPU line, calling them systems not new chips.
NVIDIA, Rebellions and SKT Plan NVLink Fusion Systems
NVIDIA, Rebellions and SK Telecom plan NVLink Fusion rack systems for Korean sovereign AI. R200 systems are expected to be ready in 2028.
Nvidia Board Opens Independent Inquiry After Intelligence Reports
The Nvidia board inquiry follows reports about Jensen Huang. Directors’ reassurance is not a completed finding on whether any secrets were compromised.
Google Plans $17bn Wyoming Data Centre on Crusoe Site
Wyoming data centre plans pair Google’s stated $17bn investment with a 702 MW fuel-cell project and CCS. Crusoe confirms the site sale, not every figure.
Infineon and SOLUM Sign MoU on HVDC for AI Data Centres
Infineon and SOLUM MoU on HVDC for AI data centres; SOLUM shows 26 kW 800 Vdc BBU aiming >98.5% efficiency, production targeted 2027.
Lambda Alabama Campus Pegged at $33.1bn Investment
Lambda Alabama: estimated $33.1bn Red Clay campus; >1,000 construction jobs projected. Alabama Power approval pending; no MW disclosed.
Revolution Wind Reaches 704 MW Commercial Operation
Revolution Wind: 704 MW commercial operation (CT 304 MW / RI 400 MW). Homes and savings figures are state estimates, not guarantees.
OSC Signs $250m Conditional Loan Commitment With 6K
OSC signs a $250m conditional loan commitment with 6K for PlusCAM NMC cathode in Jackson, TN. Further $250m private capital proposed; funds not yet disbursed.
HKUST Builds Low-Cost NiTi Stack for Elastocaloric Cooling
HKUST and Science report a stacked porous NiTi elastocaloric cooling structure lasting over 100 million cycles; lab prototype, not a commercial fridge.
Latest on TSN
Explore the TSN Atlas: Every topic we cover, mapped. Click a bubble to dive in.
