nuclear power - Page 7
Stories from nuclear power come first, newest first, then stories from connected topics (Data Centres & Energy, energy, power for AI, data centres, Tech News), each labelled with where it comes from. This view is not indexed by search engines.
Latest
Wellington IT Named in Irish Credit Unions Payee Exposure
Phoenix Credit Union says saved-payee data in online banking was exposed through a supplier flaw, in a wider incident Irish ministers have also addressed.
Google Research Open-Sources StreetReaderAI for Blind Users
Google Research has open-sourced StreetReaderAI, a map app for non-visual street exploration, built with and for blind and low-vision users.
NVIDIA Posts $115.8bn Q3 Revenue as Vera Rubin Ships
NVIDIA posted $115.8bn in third-quarter revenue, up 103% year on year, and said its Vera Rubin NVL72 platform has shipped.
OpenJDK and Red Hat Advise Fixes for the Java4Shell Flaw
CISA and the Canadian Cyber Centre have urged immediate patching of Java4Shell, CVE-2026-114938. The Centre is not aware of active exploitation.
HM Treasury Designates Five More Critical Third Parties
HM Treasury has designated five more Critical Third Parties, including BlackRock and Bloomberg, bringing the total to nine from 23 November.
Argentum AI and Kyndryl Sign $630 Million, 20-Year Boulder Deal
Argentum AI and Kyndryl have signed a 20-year, $630 million deal for an initial 10 MW of NVIDIA B300 inference capacity in Boulder. The tenant is unnamed.
Johns Hopkins Warns of US Transformer Shortages from 2027
A Johns Hopkins study projects US transformer and grid-equipment shortages from 2027, with data centres driving most of the modelled gap.
Blackstone’s BXDC to Buy About 75% of 13 AWS Data Centres
Blackstone’s BXDC has agreed to buy about 75% of 13 AWS data-centre shells in a roughly $5 billion sale-and-leaseback, expected to close in Q4 2026.
MLPerf Training v6.1 Adds First Rubin GPUs and TPUv7
MLCommons has published MLPerf Training v6.1 results from 153 systems, including the first NVIDIA Rubin GPUs and Google TPUv7.
TensorWave and OpenAI Agree a 457MW AMD MI455X Deal
TensorWave has a six-year deal to give OpenAI 457MW of AMD MI455X capacity. No value was disclosed. First capacity is due in the first half of 2027.
Latest on TSN
Explore the TSN Atlas: Every topic we cover, mapped. Click a bubble to dive in.
