HomeTagsWärtsilä

Wärtsilä

Stories from Wärtsilä come first, newest first, then stories from connected topics (on-site power, power grid, AI infrastructure, data centres, Data Centres & Energy, Big Tech), each labelled with where it comes from. This view is not indexed by search engines.

Wärtsilä, Schneider Electric and Stanley Consultants Launch a “Generator-to-Chip” Approach for US Data-Centre Power; the Speed-Up Is Their Claim

Three firms launch a 'generator-to-chip' route to faster US data-centre power. Faster delivery is their claim; no MW, customer, cost or time saved given.

Just in

Latest

UK Rooftop Solar Breaks Its Annual Record With Six Weeks Left

About 270,000 UK rooftop solar installations have already beaten the 2025 annual record, with six weeks of 2026 left, official MCS and DESNZ figures show.

Senate Passes Data-Centre Grid Cost Bill, House Still to Vote

The US Senate has passed a bipartisan 62-33 bill that would raise data-centre grid costs. It still needs the House before any new charges take effect.

Intuit Agrees to Sell Mailchimp to Bending Spoons for $3.68bn

Intuit has agreed to sell Mailchimp to Bending Spoons for about $3.68bn, as $3.31bn in cash and $368m in stock, closing early 2027 if approved.

MIT Study Estimates 650 Deaths From Data-Centre Air Pollution

An MIT model of data-centre air pollution estimates about 650 US premature deaths in 2023, with higher per-capita rates in some Midwestern states.

Alberta Tables Bill 42 for 600-Metre Data Centre Setbacks

Alberta has introduced Bill 42, a proposal for 600-metre setbacks on data centres of 10 megawatts and larger, applying only if the bill is passed.

Canada Opens Standing Offers for Carbon Dioxide Removal Credits

Canada has established national standing offers for carbon dioxide removal credits from 19 projects. The offers allow purchases but do not guarantee them.

XJTU and EPFL Report 27.96% Certified Perovskite Cells

XJTU and EPFL report perovskite cells at 27.96% certified PCE and 27.84% SPO. The 2,000-hour test used unencapsulated cells under nitrogen at about 45 °C.

MHI and SAKURA Sign MOU to Explore Japan AI Infrastructure

MHI and SAKURA internet signed an MOU to explore Japan sovereign AI infrastructure and modular data centres, with no money, capacity or dates set.

EU Strikes Provisional Deal on Faster Grid Permitting

The EU has a provisional deal to speed permits for grids and clean energy. It is not law yet; formal adoption must come first, then 1.5 years to transpose.

Microsoft Is First to Announce Intel Foundry EMIB for Azure Chips

Microsoft is first to announce Intel Foundry’s EMIB packaging for Azure chips, plus multi-year Xeon supply. No value or volumes were given.

Latest on TSN

Explore the TSN Atlas: Every topic we cover, mapped. Click a bubble to dive in.