Networking & Fibre - Page 4
Networking and fibre: subsea cables, hollow-core fibre, co-packaged optics, AI data centre switches, Wi-Fi 8 and 6G trials, explained with sources linked.
Stories from Networking & Fibre come first, newest first, then stories from connected topics (AI networking, OCP, optical components, infrastructure, AI infrastructure, Ericsson), each labelled with where it comes from. This view is not indexed by search engines.
Latest
The Quiet Bottleneck: Why Networking Will Make or Break the AI Race
Everyone’s watching the GPU wars. NVIDIA vs AMD. H100 vs MI300. The headlines scream about chip shortages, HBM constraints, and $650 billion in AI infrastructure spending.
But there’s...
kt cloud to Be Sole Tenant of Keppel’s 60MW Ansan Data Centre
On 26 November, kt cloud committed to take all of Keppel Data Centre Fund III’s 60MW Ansan data centre, targeted for service in 2030.
BT Activates Ericsson AI-native Scheduler on EE London
BT has activated Ericsson’s AI-native Scheduler for Link Adaptation across EE’s London network, saying average download throughput rose by 26 per cent.
ABB Agrees to Buy Fan Maker Ziehl-Abegg for $2.65bn
Swiss group ABB has agreed to buy German fan maker Ziehl-Abegg for an enterprise value of $2.65bn, with closing expected in the second half of 2027.
MIT Study Estimates 650 Deaths From Data-Centre Air Pollution
An MIT model of data-centre air pollution estimates about 650 US premature deaths in 2023, with higher per-capita rates in some Midwestern states.
Alberta Tables Bill 42 for 600-Metre Data Centre Setbacks
Alberta has introduced Bill 42, a proposal for 600-metre setbacks on data centres of 10 megawatts and larger, applying only if the bill is passed.
TensorWave and OpenAI Agree a 457MW AMD MI455X Deal
TensorWave has a six-year deal to give OpenAI 457MW of AMD MI455X capacity. No value was disclosed. First capacity is due in the first half of 2027.
SK Telecom and Hyosung Sign MOU on Power for AI Data Centres
SK Telecom and Hyosung signed an MOU on 345kV substation kit for GW-class AI data centres. No value, site or timetable was disclosed.
Five Firms Form AI Gigafactory Northern for a Planned Bid
Nokia, Nscale, Skeleton, Telia and Verda formed AI Gigafactory Northern and intend to bid for a Nordic-Baltic AI site. It is a planned bid, not an award.
Nebius Posts $980.8m Q3 Revenue and Sets 2027 Outlook
Nebius’s unaudited Q3 revenue was $980.8m. The company now forecasts 2026 revenue at the low end of its range and has set an initial 2027 outlook.
Latest on TSN
Explore the TSN Atlas: Every topic we cover, mapped. Click a bubble to dive in.
