Canada - Page 22
Stories from Canada come first, newest first, then stories from connected topics (power for AI, Sovereign AI, Data Centres & Energy, power grid, AI infrastructure, Tech News), each labelled with where it comes from. This view is not indexed by search engines.
Latest
Starling to Train a Banking AI Model With NVIDIA on Civo’s UK Cloud
Starling will train a transactional foundation model with NVIDIA on Civo's UK cloud. The 'first' claim is Starling's; Computer Weekly notes caveats.
Mistral Acquires New Material and Forms a Solutions Design Unit; No Deal Value Disclosed
Mistral has acquired New Material and will form a Solutions Design unit. No deal value was disclosed.
Sunrun and Tesla Home Batteries Deliver a Record 745MW to California’s Grid
Sunrun says home batteries run by it and Tesla delivered a record 745MW to California's grid on 6 October during a heat wave. No split or MWh figure given.
Tata Power Says It Has a 2.8 GW+ Data-Centre Opportunity Pipeline Across 18 Operators, and Is Upgrading Mumbai’s Grid
Tata Power says it has a data-centre opportunity pipeline of over 2.8 GW across 18 operators and is upgrading Mumbai's grid under a Rs 15,000 crore plan.
US Energy Department Plans $250 Million for 84 TVA Grid Projects Across Eight States
DOE plans $250m in federal funding for 84 TVA grid projects in eight states, adding about 2.5 GW. Awards aren't final until DOE agreements are signed.
Enerflex Wins Over 1 GW Gas Power Order for North American Data Centre
Enerflex will build over 1 GW of on-site gas power units for an unnamed North American data centre, lifting its behind-the-meter backlog past 1.75 GW.
Mainspring Energy Signs AEP Deal for Up to 1.6 GW of Linear Generators Through 2034, Starting With 190 MW From 2027
AEP will buy up to 1.6 GW of Mainspring linear generators through 2034. Only the first 190 MW, due from 2027, is a firm order. No price was disclosed.
Scaleway Announces an AMD MI355X GPU Cluster in Stockholm, an NVIDIA B300 Cluster in Copenhagen and a Three-Zone Milan Region
Scaleway announces an AMD MI355X GPU cluster in Stockholm, an NVIDIA B300 cluster in Copenhagen and a three-zone Milan region. No investment figure given.
US Energy Department Orders Emergency Measures for the Mid-Atlantic Grid, Letting PJM Call on Data-Centre Backup Generators
DOE's emergency order, in force 13-16 Oct 2026, lets PJM run listed power plants and call on backup generators to help avoid blackouts in the mid-Atlantic.
SWI Group Raises €800M at a €6.1bn Valuation for AI Infrastructure, and Plans to Turn an Ex-FTX-Backed Bitcoin Miner Into AI Data Centres
SWI Group raised €800M at a €6.1bn valuation for AI infrastructure. Its CEO reportedly plans to turn ex-FTX-backed miner Genesis Digital into AI sites.
Latest on TSN
Explore the TSN Atlas: Every topic we cover, mapped. Click a bubble to dive in.
